h1: "Changes between 2017 and 2020 Scrum Guides"
popis: "Scrum is a framework for developing and sustaining complex products. The Scrum Guide contains the official definition of Scrum as authored by Ken Schwaber and Jeff Sutherland."
jazyk: "en"
kanonicka: ""
drobecky: []
zdroj: "live"
wayback_snapshot: ""
stazeno: "2026-09-14 04:19:34"
znaku: 11657
slov: 1914
kodovani: "utf-8"
sha256: "b6fc20e2092dceca4457d9703060993427e5954790be9ca477bb31100c9e7452"
---
1. Even Less Prescriptive Over the years, the Scrum Guide started getting a bit more prescriptive. The 2020 version
aimed to bring Scrum back to being a minimally sufficient framework by removing or softening
prescriptive language. e.g. removed Daily Scrum questions, soften language around PBI attributes,
soften language around retro items in Sprint Backlog, shortened Sprint cancellation section,
and more.
2. One Team, Focused on One Product The goal was to eliminate the concept of a separate team within a team that has led to
“proxy” or "us and them” behavior between the PO and Dev Team. There is now just one Scrum Team
focused on the same objective, with three different sets of accountabilities: PO, SM, and Developers.
3. Introduction of Product Goal The 2020 Scrum Guide introduces the concept of a Product Goal to provide focus for the Scrum
Team toward a larger valuable objective. Each Sprint should bring the product closer to the overall
Product Goal.
4. A Home for Sprint Goal, Definition of Done, and Product Goal Previous Scrum Guides described Sprint Goal and Definition of Done without really giving them an
identity. They were not quite artifacts but were somewhat attached to artifacts. With the addition
of Product Goal, the 2020 version provides more clarity around this. Each of the three artifacts
now contain ‘commitments’ to them. For the Product Backlog it is the Product Goal, the Sprint Backlog
has the Sprint Goal, and the Increment has the Definition of Done (now without the quotes) . They
exist to bring transparency and focus toward the progress of each artifact.
5. Self-Managing over Self-Organizing Previous Scrum Guides referred to Development Teams as self-organizing, choosing who and how
to do work. With more of a focus on the Scrum Team, the 2020 version emphasizes a self-managing
Scrum Team, choosing who, how, and what to work on.
6. Three Sprint Planning Topics In addition to the Sprint Planning topics of “What” and “How”, the 2020 Scrum Guide places
emphasis on a third topic, “Why”, referring to the Sprint Goal.
7. Overall Simplification of Language for a Wider Audience The 2020 Scrum Guide has placed an emphasis on eliminating redundant and complex statements
as well as removing any remaining inference to IT work (e.g. testing, system, design, requirement, etc).
The Scrum Guide is now less than 13 pages.
1. Added section on the Uses of Scrum: Scrum was initially developed for managing and developing products. Starting in the early
1990s, Scrum has been used extensively, worldwide, to: Scrum has been used to develop software, hardware, embedded software, networks of
interacting function, autonomous vehicles, schools, government, marketing, managing the
operation of organizations and almost everything we use in our daily lives, as individuals and
societies. As technology, market, and environmental complexities and their interactions have rapidly
increased, Scrum’s utility in dealing with complexity is proven daily.
Scrum proved especially effective in iterative and incremental knowledge transfer. Scrum is
now widely used for products, services, and the management of the parent organization.
The essence of Scrum is a small team of people. The individual team is highly flexible and
adaptive. These strengths continue operating in single, several, many, and networks of teams
that develop, release, operate and sustain the work and work products of thousands of people.
They collaborate and interoperate through sophisticated development architectures and target
release environments. When the words “develop” and “development” are used in the Scrum Guide, they refer to
complex work, such as those types identified above.
1. Research and identify viable markets, technologies, and product capabilities;
2. Develop products and enhancements;
3. Release products and enhancements, as frequently as many times per day;
4. Develop and sustain Cloud (online, secure, on-demand) and other operational
environments for product use; and,
5. Sustain and renew products.
2. Changed wording in The Scrum Master section to provide better clarity to the role. The text now reads: The Scrum Master is responsible for promoting and supporting Scrum as defined in the
Scrum Guide. Scrum Masters do this by helping everyone understand Scrum theory,
practices, rules, and values. The Scrum Master is a servant-leader for the Scrum Team. The Scrum Master helps those
outside the Scrum Team understand which of their interactions with the Scrum Team are
helpful and which aren’t. The Scrum Master helps everyone change these interactions to
maximize the value created by the Scrum Team.
3. Added to the section Scrum Master Service to the Product Owner Ensuring that goals, scope, and product domain are understood by everyone on the Scrum
Team as well as possible.
4. Updated the first paragraph of the Daily Scrum section to read: The Daily Scrum is a 15-minute time-boxed event for the Development Team. The Daily
Scrum is held every day of the Sprint. At it, the Development Team plans work for the next
24 hours. This optimizes team collaboration and performance by inspecting the work since
the last Daily Scrum and forecasting upcoming Sprint work. The Daily Scrum is held at the
same time and place each day to reduce complexity.
5. Updated the Daily Scrum section to provide clarity on the goals of
the Daily Scrum including this text: The structure of the meeting is set by the Development Team and can be conducted in
different ways if it focuses on progress toward the Sprint Goal. Some Development Teams
will use questions, some will be more discussion based. Here is an example of what might
be used:
- What did I do yesterday that helped the Development Team meet the Sprint
Goal?
- What will I do today to help the Development Team meet the Sprint Goal?
- Do I see any impediment that prevents me or the Development Team from
meeting the Sprint Goal?
6. Added clarity around time-boxes Using the words “at most” to remove any questions that the time-box for Events means maximum length, but
could be shorter.
7. Added to the Sprint Backlog section: To ensure continuous improvement, it includes at least one high priority way in which the
team works, identified in the previous Retrospective meeting.
8. Added clarity to the Increment section: An increment is a body of inspectable, "Done"" work that supports empiricism at the end of
the Sprint. The increment is a step toward a vision or goal.
1. A section on Scrum Values. When the values of commitment, courage, focus, openness
and respect are embodied and lived by the Scrum Team, the Scrum pillars of transparency,
inspection, and adaptation come to life and build trust for everyone. The Scrum Team members
learn and explore those values as they work with the Scrum events, roles and artifacts. Successful use of Scrum depends on people becoming more proficient in living these five
values. People personally commit to achieving the goals of the Scrum Team. The Scrum Team
members have courage to do the right thing and work on tough problems. Everyone focuses on
the work of the Sprint and the goals of the Scrum Team. The Scrum Team and its stakeholders
agree to be open about all the work and the challenges with performing the work. Scrum Team
members respect each other to be capable, independent people.
1. A section on Artifact Transparency has been added. Scrum relies on transparency.
Decisions to optimize value and control risk are made based on the perceived state of
the artifacts. To the extent that transparency is complete, these decisions have a sound
basis. To the extent that the artifacts are incompletely transparent, these decisions can
be flawed, value may diminish and risk may increase.
2. Sprint Planning is now one event. Two topics are addressed in it: What can be done this
Sprint, and How will the chosen work be done. After the Development Team forecasts
the Product Backlog items for the Sprint, the Scrum Team crafts a Sprint Goal. The Sprint
Goal creates coherence in the Development Team’s work that would not be present in separate
initiatives without a common goal. Note the formal inclusion of a Sprint Goal.
3. The Product Backlog is refined rather than groomed. The refined Product Backlog items
are transparent, well enough understood and granular enough to be input for the Sprint
Planning and for selection for the Sprint. Product Backlog items with this transparency
are called “Ready.” Ready and Done are two states that reinforce transparency.
4. Scrum prescribes its events to create regularity and to minimize the need for meetings
not defined in Scrum. All events are time-boxed events, such that every event has a
maximum duration. A Sprint, as container event, has a fixed duration that cannot be
shortened or lengthened. The remaining events may end whenever the purpose of the
event is achieved; ensuring an appropriate amount of time is spent without allowing
waste in the process.
5. The importance of the Daily Scrum as a planning event is reinforced. Too often it is seen
as a status event. Every day, the Development Team should understand how it intends
to work together as a self-organizing team to accomplish the Sprint Goal and create the
anticipated Increment by the end of the Sprint. The input to the meeting should be how
the team is doing toward meeting the Sprint Goal; the output should be a new or
revised plan that optimizes the team’s efforts in meeting the Sprint Goal.
To that end, the three questions have been reformulated to emphasize the team over
the individual:
1. What did I do yesterday that helped the Development Team meet the Sprint
2. What will I do today to help the Development Team meet the Sprint Goal?
3. Do I see any impediment that prevents me or the Development Team from meeting the Sprint Goal?
6. The concept of value is reinforced to use in the Sprint Review. During the Sprint Review,
the Scrum Team and stakeholders collaborate about what was done in the Sprint. Based
on that and any changes to the Product Backlog during the Sprint, attendees collaborate
on the next things that could be done to optimize value.
1. Development Teams do not commit to completing the work planned during a Sprint Planning Meeting. The
Development Team creates a forecast of work it believes will be done, but that forecast will change as more
becomes known throughout the Sprint.
2. Scrum does not mandate a burn-down chart to monitor progress. Scrum requires only that:
- Remaining work for a Sprint is summed and known on a daily basis.
- Trending toward completing the work of the Sprint is maintained throughout the Sprint.
3. Release Planning is a valuable thing to do when using Scrum, but isn’t required by Scrum itself.
4. The Sprint Backlog is the Product Backlog items selected for the Sprint, plus a plan for delivering them.
There is no longer a required concept of "Sprint Backlog items" although that technique can make a great plan. A
self-organizing Development Team always has a plan.
5. The Product Backlog is "ordered," instead of "prioritized," providing flexibility to the Product Owner to
optimize value in his or her unique circumstances.
6. Added the practice of Product Backlog Grooming.
7. Removal of many tips, optional practices and techniques.
8. The team of people performing the work of creating an Increment is the Development Team. Regardless of the
work performed by individual team members, they are known as Developers.
9. Removed the reference to chickens and pigs.
10. Removed reference to undone work.